• Wed. Mar 22nd, 2023

Second Phase of Mumbai Metro’s 2A and 7 Lines to Be Operational Soon, Says MMRDA

By

Jan 7, 2023

The MMRDA will take a 16-hour mega block for the integration of the first phase of metro lines with the second phase between 6 am to 10 pm on January 8 on lines 2A and 7 for testing of integrated signalling systems.

Leave a Reply

Your email address will not be published. Required fields are marked *

Generated by Feedzy